The fourth bridge across the Grand Canal in Venice — Il IV ponte sul Canal Grande a Venezia (CM 5/2008)
The paper describes the building and erection of the fourth bridge over the Grand Canal in Venice. This work is a kind... Learn More
Raising of a surface covering 3 hectares and weighing 8500 tons to a height of 40 metres in a single manoeuvre – Sollevamento con un’unica manovra a 40 metri d’altezza, di una copertura di circa 3 ettari di area e del peso di 8500 tonnellate (CM 6/2004)
The fundamental idea behind this assembly was to connect the whole roof on the ground (8500 tonnes approx.), including the plant and... Learn More