Il nuovo ponte per lo scavalco della A22 e il Torrente Avisio presso Lavis in provincia di Trento — The new bridge across the River Avisio on the A22 motorway near Lavis, in the Province of Trento (CM 3/2009)
The new bridge over the River Arno at Pontedera, near Pisa — Il nuovo ponte sull’Arno a Pontedera (CM 1/2010)
The Viaducts Incoronata, Tanagro and Petroso on the A3 Salerno-Reggio Calabria motorway — I viadotti Incoronata, Tanagro e Petroso sulla Salerno Reggio-Calabria (CM 2/2010)
FAILED BRIDGES, CASE STUDIES, CAUSES AND CONSEQUENCES – Joachim Scheer, Ernst & Sohn 2010 (cm 4/2010)
Gli effetti del degrado da fatica e corrosione sui ponti ferroviari in carpenteria metallica: un approccio integrato per la valutazione della vita residua — On the effects of fatigue and corrosion degradation of metal railway bridges: an integrated approach to the assessment of the remaining lifetime (CM 6/2010)
The steel construction in the nineteenth century: an excellent case-study — Le costruzioni metalliche del XIX secolo: un caso-studio d’eccellenza (CM 2/2011)
The assembly and launch of the railway bridge above the Polcevera river, Genoa — Il montaggio e il varo del ponte ferroviario sul Polcevera a Genova (CM 3/2011)