PROCEDURA DI INSTALLAZIONE DI UNA GRANDE COPERTURA A CAVI E TELA: Big Lift del Khalifa Stadium Coppa del Mondo in Qatar 2022 — METHODOLOGY FOR TENSILE STRUCTURE ERECTION SEQUENCE: FIFA World Cup 2022 Khalifa Stadium Big Lift (CM 4/2017)
THE STEEL STADIUM The new Municipal Stadium “C. Puttili” – Barletta — LO STADIO IN ACCIAIO Il nuovo Stadio Comunale “C. Puttili” – Barletta (CM 4/2017)
IL NUOVO QUARTIER GENERALE DI JTI A GINEVRA: un incontro tra architettura e ingegneria innovative — THE NEW JTI HEADQUARTERS IN GENEVA: a merging of innovative architecture and engineering (CM 4/2017)
THE BASRA CABLE STAYED BRIDGE: a new crossing over the Shatt al-Arab in Iraq — IL PONTE STRALLATO DI BASSORA: un nuovo attraversamento sullo Shatt al-Arab in Iraq (CM 5/2017)
BIM, an emblematic case: H&M Flagshipstore in Rome — BIM, un caso emblematico: il Flagshipstore H&M di Roma (CM 6/2017)
THE TEST TOWER OF METALSISTEM S.p.A. R&D DIVISION — LA TORRE PROVE DELLA DIVISIONE RICERCA E SVILUPPO DI METALSISTEM S.p.A. (CM 6/2017)
THREE SUSPENSION BRIDGES IN TUSCANY: STADANO, MULAZZO, AND CASTAGNETOLI — TRE PONTI SOSPESI IN LUNIGIANA: STADANO, MULAZZO E CASTAGNETOLI (CM 1/2018)
STEEL IN NEW CONSTRUCTIONS, REFURBISHMENT AND SEISMIC RETROFITTING: General Report on Realizations — L’ACCIAIO NELLE NUOVE COSTRUZIONI, NEL RIPRISTINO E NELL’ADEGUAMENTO SISMICO: Relazione generale sulle Realizzazioni (CM 1/2018)
LA MODULARIZZAZIONE NELL’INDUSTRIA PETROLCHIMICA IL PROGETTO STRUTTURALE: dalle fasi costruttive alle condizioni operative — MODULAR SOLUTIONS IN PETROCHEMICAL FACILITIES THE STRUCTURAL DESIGN design from construction to operating conditions (CM 2/2018)