Post fire analyses of a long span roof structure — ANALISI POST-INCENDIO DI UNA COPERTURA DI GRANDE LUCE (CM 5/2017)
BIM, an emblematic case: H&M Flagshipstore in Rome — BIM, un caso emblematico: il Flagshipstore H&M di Roma (CM 6/2017)
BIM DESIGN INTEGRATION Prysmian group headquarters – Milano — L’INTEGRAZIONE PROGETTUALE DEL BIM Nuova sede Prysmian – Milano (CM 1/2018)
PROGETTO DI RIQUALIFICA E ADEGUAMENTO SISMICO DI SOVRAPPASSO AUTOSTRADALE: analisi per fasi e vantaggi di un approccio BIM — REHABILITATION AND SEISMIC RETROFITTING OF A HIGHWAY FLYOVER: construction stages analysis and BIM approach advantages (CM 4/2018)
LA MESSA IN SICUREZZA DELLA BASILICA DI SAN BENEDETTO A NORCIA con struttura metallica in tubo e giunto — THE SECURING INTERVENTION ON ST. BENEDETTO’S CHURCH IN NORCIA with a steel tube-coupler shoring system (CM 5/2018)
(CTA 2015) L’ACCIAIO ED IL PATRIMONIO STORICO ARCHITETTONICO —– THE STEEL AND THE HISTORICAL ARCHITECTURAL HERITAGE
(CTA 2015) SISTEMI DI RIVESTIMENTO IN ACCIAIO PER L’OVER-CLADDING DI EDIFICI ESISTENTI: ASPETTI COSTRUTTIVI E IMPLEMENTAZIONE DI UNA METODOLOGIA PROGETTUALE BIM-BASED —– STEEL ENVELOPE SYSTEMS FOR THE OVER-CLADDING OF EXISTING BUILDINGS: CONSTRUCTION FEATURES AND IMPLEMENTATION OF BIM-BASED DESIGN METHODOLOGY
(CTA 2015) L’ACCIAIO NEL RESTAURO STRUTTURALE DEGLI EDIFICI STORICI —– STEEL IN THE STRUCTURAL RESTORATION OF HISTORICAL BUILDINGS
(CTA 2015) MIGLIORAMENTO STRUTTURALE DELLE TRIBUNE STORICHE DELL’IPPODROMO DEL GALOPPO DI SAN SIRO A MILANO —– STRENGHTENING OF THE HISTORIC STANDS OF THE SAN SIRO GALLOP RACE-COURSE IN MILAN
(CTA 2015) PROVE SPERIMENTALI SULL’INFLUENZA DELLA LUNGHEZZA DI ANCORAGGIO PER GIUNTI TRA PIATTI DI ACCIAIO COLLEGATI CON INCOLLAGGIO DI C-FRP —– EXPERIMENTAL TESTS ON THE INFLUENCE OF BONDING LENGTH FOR STEEL PLATE-TO-PLATE SPLICES CONNECTED WITH EXTERNALLY BONDED C-FRPS